Pallet drum/IBC filler-capper

packr-a1-flexeo-p1-312x450




UP TO 40 DRUMS / HOUR


› Easy and quick installation

› Ergonomic and compact design

› Easy manual operation

› Many options and ancillary equipment available

– Conveyor systems and controls

– Manual bunging and crimping tools

– Customized controls and interfaces

– Operator platforms and cleaning stations




UP TO 40 DRUMS / HOUR


Integration of full automatic functions :

-Bung detection with 2D camera

-Bung removal

-Product filling (with automatic grounding for hazardous execution)

-Bung replacement (with torque control)

-Cap seal crimping

-Conveyor and controls system easily integrated with filler

  • Labour cost reduction (no human intervention)
pr1500-robot-675x450

Drum by drum filler capper







    UP TO 120 DRUMS / HOUR


    High-speed filling machines

    • – Simultaneous execution of automatic operations on each station : debunging, filling, bunging, crimping.
      -Fast format changeovers (Click&Play tooling system)
    • Precise positioning of drums during transfers from station to station (held in place by grippers)
    • Quick return on investment (no giveaway / high production capacity)

     


    OLYMPUS DIGITAL CAMERA